Portfolio Category: Case Studies

Michael House – Water Damaged

Michael House was probably the most water damaged property we have ever come across. The occupier had taken time to travel abroad for three months, and in that period a major flood had unfortunately damaged pretty much every part of the property. All of the rooms showed signs of severe water damage with ceilings, floors,…
Read more

Extensive Fire Damaged Property

This was a pretty extensive project. The whole building had suffered damage, and required a complete refurbishment on all floors - interior and exterior. We were required to gut each level practically back to the brick work, and then start a complete refurbishment program stripping out all damaged materials. The image gallery gives a good…
Read more

Commercial Tea Rooms Project

Rapid Response were commissioned to build a large tea room facility and mezzanine within an existing commercial building. This was a large project and involved a complete build of the facility within an existing commercial unit. The project firstly required the structural steels to be erected which would contain the ground floor tea rooms and…
Read more

Dangerous Structure Rectified

This was a classic case of home DIY gone wrong. The house had been repossessed and was owned by the banks. We were asked to take a look at the property to ascertain the work required to make sure the house was safe and ready for sale. A dorma roofs had been fitted in the…
Read more